Asset solution overlay

REALTIMEais Partner Network · Services

Accurate field data, qualified engineering, and results your workers can use at the equipment.

prevent hazards before they happen

Advantage image

NFPA 70E requires an arc flash risk assessment before work on energized equipment, and it requires that assessment to be kept current as your system changes. A study is only as good as the field data behind it.

Too many studies end as a static report and a set of labels. When equipment is added or settings change, nobody can tell which results are still valid.

  • Equipment inventory and scoping walkdown
  • Field data collection using Smart Labels and the REALTIMEais app
  • System modeling and one-line diagram development
  • Short-circuit, protective device coordination, and arc flash incident energy analysis (IEEE 1584)
  • Equipment duty evaluation
  • Hazard reduction recommendations and design options
  • Arc flash label design and installation
  • Study updates and reviews of existing models

Deliverables

chat icon

Engineering study report with findings and recommendations

chat icon

Virtual one-line diagram, linked to each device

chat icon

Arc flash labels, with a digital proof stored on every device page

chat icon

Device-level results: incident energy, arc flash boundary, and shock data

chat icon

Prioritized list of hazard reduction opportunities

chat icon

Field data set with photos for every device collected

Discuss your project

Tell us where the work is and what you need. The Partner Network Team will match you with qualified experts and reply within one business day.

    What is Refresh icon

    or call 866-558-4313

    tracking tool overlay

    The three engagement options

    Whichever option you choose, every finding, report, and record lands in your REALTIMEais platform.
    check icon

    30 years overseeing arc flash data collection projects, captured in a published data collection handbook that field teams follow

    check icon

    One walkdown serves two requirements: the arc flash inventory and the NFPA 70B equipment inventory

    check icon

    Analysis and labels aligned with IEEE 1584-2018, NFPA 70E, and ANSI Z535.4

    [Customer result or quote: to be added when approved]

    How often does an arc flash study need to be updated?

    NFPA 70E calls for a review at intervals not to exceed five years, and whenever a major modification or renovation takes place.

    We already have a study. Can you use it?

    Yes. An existing model can be loaded into REALTIMEais and reviewed, so you start from what you have instead of starting over.

    Can our own electricians or contractor collect the field data?

    Often, yes. Trained field teams collect data with the REALTIMEais app, and a Network engineering partner performs the analysis.

    Will the work require an outage?

    Data collection is planned around your operations. Any tasks that need equipment de-energized are identified in the scope.

    Who installs the labels?

    Labels can be installed by the Network field team or printed for your own staff to apply.